e-learning

Roughneck Training-Part 2: Laying Down Pipe (DVD)

After total depth has been reached, roughnecks must pull out and lay down the pipe. Rigging down and moving the rig should be done with as much care as drilling. All the equipment will be used on another job, so it is important that roughnecks do their job right. This video shows how drill pipe and drill collars should be laid down, inspected, and prepared for transport to the next location. 1983, 11 minutes, comes with a workbook.

 

Click here to see the entire Roughneck Training Series (DVD)

 

To purchase additional workbooks, instructor's guides or for multiple licenses, please contact us at 800.687.4132 or 512.471.5940 or by sending an email to info@petex.utexas.edu.

Distance Learning Certificate Programs FAQ

Catalog # Format Price  
65.0521 DVD $85.00