Page 28 - A Primer of Oilwell Drilling, 7th Edition
P. 28

Index                                                                                        241




               tons, 2                                            waiting on cement (WOC) condition, 159
               tool joint, 108                                    walking bean, 15
        Petroleum Extension-The University of Texas at Austin
               toolpush, 3                                        wall cake, 12
               toolpushers, 3, 44                                 water wells, 75
               top drives, 18, 117–118                            weight indicator, 139
                   advantages of, 118                             weight on bits and rotating speeds, 126
               top-drive systems, 110                             wellbore, 111
               top drive system vs. rotary-table system, 152      well completion, 136, 173–178
               top plugs, 159                                         completing a producing well, 173–174
               topside, 92                                            perforating, 176–177
               torque, 99                                             plugging and abandoning wells, 173
               total depth (TD), 162                                  production tubing, 174–175
               tours, 49                                              well testing and treating, 177–178
               Townsend, James M., 9                              well control, 183–188
               transmission lines, 99                             wellhead equipment, 128
               traps, 60, 64–65                                   well logging, 165–167
                                                                  well logging company, 42
               traveling blocks, 100                              wells, 1
               trim, 54                                           well site, 9
               triples (pipeline), 89                             well-sorted rock grains, 58
               tripping in, 46                                    well testing and treating
               tripping out, 46                                       acidizing, 177
               trips, 108                                             fracturing, 177
               truncated layers, 62                                   gravel packing, 178
               turnkey basis contracts, 40                        well types, 69
               turntables, 18, 111                                whipstocks, 179
                                                                  white gas, 57
                                                                  whole coring, 170
               vacuum degasser, 132                               wildcatters, 65
               value moment, 50                                   wild cat wells, 65
               V-door, 110                                        wireline, 166
               vugs, 59                                           work shifts, 50
   23   24   25   26   27   28   29   30